Friday, 14 August 2015

Filling the pool

Within a day of the Quartzon being applied, the pool had to be filled.  Once water is flowing into the pool, it can't be stopped. If flow stops a line is left in the finish of the pool.


At dawn the next day.


From our garden tap, it took just over a day to be half way up the skimmer box - about 1.5 tiles from the coping tile (a little higher than in this picture).



No comments:

Post a Comment